The Enclaves
Looking down Elk Grove Lane and the house ready for the concrete pour. May 5, 2017
May 5, 2017
Garage straight ahead then the kitchen on the opposite side of the board.
Master Bathroom Water Closet
Lanai on the left and the Master Bedroom on the right.
Construction of our house underway
Left is the island water lines, cneter front is water softener and wash tub water lines. In the distance are the connections for the guest bath.
Ready for the concrete poor
Ready for the concrete poor. Visible is the grounding bar and the water line for the hose bib.
May 7, 2017
Guest Room and Bath
Guest Bedrom and Bath
Our new house under construction behind me
May 10, 2017
Concrete poured today
Master Bathroom
Air Conditioner Condenser pad
Lanai
Backyard
Concrete poured today. In the forground the laundry room and HVAC , far center is the kitchen, and on the left in the distance the guest bathroom.
May 11, 2017
Some grading has been done. Our home under construction
Our home under construction
Grading has done on the side of the house. Our home under construction